Media Arts Collaborative Charter School
P 505.243.1957
F 505.268.1651

MACCS Waterline Replacement Project

August 24, 2018 4:23 pm/Published by Jonathan Dooley


The Albuquerque Water Utility Authority will be replacing the waterline along Copper from Washington to San Mateo. The project will begin Monday, August 27, and is expected to take 45 days. Access to MACCS from Copper may not be possible during this time.

I Please refer to the Water Utility Authority flyer and the MACCS Drop Off/ Pick Up Map. We appreciate the cooperation of our MACCS families during the construction. For the time being, access to MACCS needs to be from Adams via Central Avenue. 

Jonathan Dooley, Principal


  • Congrats MACCS on 5-Year Charter School Renewal!
  • MACCS Wins THREE 2018 Emmys!
  • PAC Annual Spaghetti Dinner & Dessert Auction, Friday, October 19, 6pm
  • MACCS Earns "B" School Grade from PED!

Let's Connect